Monday, March 23, 2015

Rejuvenating the Maintenance Building

We have used this Winter for a time to focus on areas that may get less attention in the Summer. Mainly meaning inside our shop. Although we clean at least once a week, with 30 bodies going in and out multiple times a day, dirt is bound to accumulate. We gave everything a fresh coat of paint, installed new ceiling tiles, new baseboard, new window blinds, reorganized and threw away built up records.


Bathroom
The bathroom got a complete makeover. We repainted the walls, replaced the ceiling tiles, replaced the toilet, replaced the cabinet and refinished the floor.




Bathroom Before

Bathroom Floor Before

Bathroom Floor Before

Bathroom Floor 

Bathroom Floor

Bathroom Floor

Bathroom After




Bathroom Floor After

Bathroom After


Break Room

Break Room Before



Break Room Floor Board Before

Break Room Before

Break Room After

Break Room After

Break Room After




Office

Desk Area Before

Desk Area Before

Desk Area After

Desk Area After

Ron's Office Before


Ron's Office After

1 comment: